Asphalt Work at Town Centre

Concrete repairs in the parking lot of the Community Center (part of Town Centre) are scheduled for Saturday, December 2. Town Centre’s vendor will arrive between 6:30 and 7 a.m. to cone off areas that need to be addressed, leaving the drive aisles available for traffic flow, if needed.

Please click the orange download button below to view the map of scheduled work.

Pour plus de nouvelles du village, cliquez sur le tag « Quoi de neuf dans le village » ci-dessous.