{"id":18050,"date":"2017-07-19T22:42:57","date_gmt":"2017-07-19T22:42:57","guid":{"rendered":"https:\/\/dev-laguna-woods.pantheonsite.io\/news\/document\/third-standard-5b-satellite-dishes-on-2-story-buildings\/"},"modified":"2025-07-09T15:14:24","modified_gmt":"2025-07-09T22:14:24","slug":"third-standard-5b-satellite-dishes-on-2-story-buildings","status":"publish","type":"document","link":"https:\/\/lagunawoodsvillage.com\/zh_hk\/document\/third-standard-5b-satellite-dishes-on-2-story-buildings\/","title":{"rendered":"Third Standard 05B &#8211; Satellite Dishes on 2 Story Buildings"},"content":{"rendered":"<p>dR<\/p>\n<p>UN<\/p>\n<p>THIRD LAG<\/p>\n<p>\u5443<\/p>\n<p>\/<\/p>\n<p>A HILLS<\/p>\n<p>STANDARD 5B: SATELLITE DISHES; TWO-STORY BUILDINGS<\/p>\n<p>ADOPTED NOVEMBER 2006, RESOLUTION 03-06-58<\/p>\n<p>REVISED APRIL 2007, RESOLUTION 03-07-32<\/p>\n<p>GENERAL REQUIREMENTS REVISED APRIL 2011, RESOLUTION 03-11-49<\/p>\n<p>REVISED NOVEMBER 2013, RESOLUTION 03-13-120<\/p>\n<p>GENERAL REQUIREMENTS REVISED JANUARY 2018, RESOLUTION 03-18-12<\/p>\n<p>REVISED JUNE 2018, RESOLUTION 03-18-87<\/p>\n<p>1.0<\/p>\n<p>GENERAL REQUIREMENTS<\/p>\n<p>SEE STANDARD 1: GENERAL REQUIREMENTS<\/p>\n<p>2.0<\/p>\n<p>APPLICATIONS<\/p>\n<p>21<\/p>\n<p>Any installation permitted in Mutual Common Area at two story<\/p>\n<p>buildings must follow all guidelines set forth by the following Mutual<\/p>\n<p>Alteration Standard.<\/p>\n<p>2.2<\/p>\n<p>Prior to<\/p>\n<p>installation of any satellite dish,<\/p>\n<p>a plan and the<\/p>\n<p>specifications of all proposed work and equipment must be<\/p>\n<p>submitted for approval as specified in Section 1.5. The submitted<\/p>\n<p>plan must indicate all work to be done, i.e., type of dish, size, a full<\/p>\n<p>description, it&#8217;s location on the building, anchoring, and method of<\/p>\n<p>sealing wall(s) and attachments. Site location will be contingent<\/p>\n<p>upon Mutual approval.<\/p>\n<p>23<\/p>\n<p>The Member<\/p>\n<p>\u5fc5\u9808<\/p>\n<p>indemnify the Mutual<\/p>\n<p>and assumes all<\/p>\n<p>responsibility for any damage including, but not limited to, roof or<\/p>\n<p>wall damage, or damage from moisture intrusion resulting from<\/p>\n<p>improper installation of the satellite dish.<\/p>\n<p>24<\/p>\n<p>No satellite dish will be permitted which may become hazardous to<\/p>\n<p>other residents or workmen due to its location or dimensions.<\/p>\n<p>2.5<\/p>\n<p>Any satellite dish must be made easily removable as required for<\/p>\n<p>performance of maintenance. In the event a satellite dish must be<\/p>\n<p>removed it must be the Mutual Member&#8217;s responsibility to remove<\/p>\n<p>and properly store the dish until such time that maintenance work<\/p>\n<p>has been completed. The cost of removal, storage and re-<\/p>\n<p>installation must be borne by the Mutual Member.<\/p>\n<p>2.6<\/p>\n<p>Any satellite dish installation must follow all guidelines set forth by<\/p>\n<p>\u9019<\/p>\n<p>Federal<\/p>\n<p>\u901a\u8a0a<\/p>\n<p>Commission&#8217;s<\/p>\n<p>Over-the-Air-<\/p>\n<p>Reception- Devices rule (OTARD).<\/p>\n<p>Standard 5B \u2014 Satellite Dishes: 2 Story Buildings<\/p>\n<p>Page 1 of 5<br \/>\n2.7<\/p>\n<p>Any installation violating these guidelines is subject to immediate<\/p>\n<p>removal at the sole cost of the Mutual Member, and restoration of<\/p>\n<p>any Mutual property, at the Member&#8217;s expense.<\/p>\n<p>2.8<\/p>\n<p>Should the proposed location of a satellite dish be in an area that is<\/p>\n<p>Common Area, the applicant is required to execute and submit to<\/p>\n<p>Third Laguna Hills Mutual, prior to installation of a dish, the<\/p>\n<p>\u201cAgreement Regarding Satellite Dish Installation on Common Area<\/p>\n<p>Property.\u201d<\/p>\n<p>2.9<\/p>\n<p>Should the proposed location of a satellite dish be in a location that<\/p>\n<p>is currently occupied by a functional solar panel, an alternate<\/p>\n<p>location will be designated by the Alteration Division.<\/p>\n<p>2.10 All satellite dish installations must be removed at the time of resale.<\/p>\n<p>3.0<\/p>\n<p>INSTALLATION GUIDELINES<\/p>\n<p>3.41<\/p>\n<p>Satellite dish installation is permitted on Exclusive Use Common<\/p>\n<p>Area, e.g. patios or balconies. Dish must stay within footprint of<\/p>\n<p>patio or perimeter of balcony railing.<\/p>\n<p>3.2<\/p>\n<p>Only one (1) satellite dish per manor is allowed.<\/p>\n<p>3.3<\/p>\n<p>Any satellite dish installed on Common Area must not exceed a<\/p>\n<p>diameter of 36\u201d, with the exception of manor types listed in<\/p>\n<p>paragraph 3.16 herein.<\/p>\n<p>3.4<\/p>\n<p>No coaxial cable must be larger than 2\u201d diameter.<\/p>\n<p>3.5<\/p>\n<p>Unless otherwise specified, coaxial cable must be encased in 2&#8243;,<\/p>\n<p>26 gauge steel wire mold fastened to the surface of the wall with %%\u201d<\/p>\n<p>mounting clips and anchors, specified for stucco, attached every<\/p>\n<p>four feet. Wire mold must be painted to match the surface to which<\/p>\n<p>it is attached prior to installation. Fasteners must be properly<\/p>\n<p>sealed to prevent moisture intrusion. Sealants must be specifically<\/p>\n<p>manufactured for the application for which it is used.<\/p>\n<p>3.6<\/p>\n<p>Drilling through a roof is prohibited.<\/p>\n<p>3.7<\/p>\n<p>Utilization of any GRF Broadband installation and\/or equipment is<\/p>\n<p>prohibited.<\/p>\n<p>3.8<\/p>\n<p>Mounting of a satellite dish to PVC, ABS, plumbing vent pipes is<\/p>\n<p>prohibited.<\/p>\n<p>3.9<\/p>\n<p>No satellite dish or any portion of a satellite dish and its related<\/p>\n<p>members must be attached to any built-up roofing on a flat roof.<\/p>\n<p>3.10<\/p>\n<p>Mounting a satellite dish on a chimney is prohibited.<\/p>\n<p>Standard 5B \u2014 Satellite Dishes: 2 Story Buildings<\/p>\n<p>Page 2 of 5<br \/>\n3.11<\/p>\n<p>No modifications to any fascia, rain gutter or plumbing vent must be<\/p>\n<p>permitted. A satellite dish installation must not obstruct a rain gutter<\/p>\n<p>or plumbing vent in any way.<\/p>\n<p>3.12<\/p>\n<p>Satellite dishes and installation materials must be grounded in<\/p>\n<p>accordance with the National Electric Code.<\/p>\n<p>3.13<\/p>\n<p>Buildings with flat roof and mansard roof<\/p>\n<p>(a)<\/p>\n<p>Place the satellite dish approximately 15 feet from the edge<\/p>\n<p>of the flat roof above the manor for which the service is<\/p>\n<p>being provided. At no time can the dish be mounted on the<\/p>\n<p>side of the building or to existing fascias.<\/p>\n<p>(b)<\/p>\n<p>For installation of a satellite dish onto a flat PVC cool roof,<\/p>\n<p>the member must install a 3\u2019 X 3\u2019 satellite dish pad provided<\/p>\n<p>by the Mutual&#8217;s roofing contractor at the expense of the<\/p>\n<p>Member.<\/p>\n<p>(c)<\/p>\n<p>Mount the satellite dish on a non-penetrating satellite dish<\/p>\n<p>roof-mount weighted down by a minimum of four, 8\u201d x 8\u201d x<\/p>\n<p>16\u201d cinderblocks (see Example 1 below).<\/p>\n<p>(d)<\/p>\n<p>Extend the coaxial cable from the dish, across the surface of<\/p>\n<p>the roof, to the mansard roof. Continue over the mansard<\/p>\n<p>roof and rain gutter, firmly and without slack, until the coaxial<\/p>\n<p>cable reaches the overhang. (Do not alter or damage the tile<\/p>\n<p>or rain gutter in any way.<\/p>\n<p>(e)<\/p>\n<p>Attach wire mold to the overhang, continue in a straight line<\/p>\n<p>to the wall of the building, and down vertically and<\/p>\n<p>horizontally, as required, to provide entry to the manor 24&#8243;<\/p>\n<p>from the floor. Encase the coaxial cable in the attached wire<\/p>\n<p>mold. Penetrate the wall to bring coaxial cable into the<\/p>\n<p>manor. (See 3.5)<\/p>\n<p>(0)<\/p>\n<p>Do not place wire mold within 18&#8243; of balconies, balcony<\/p>\n<p>railings or balcony overhangs. Do not place wire mold across<\/p>\n<p>any part of an overhang vent or near, or on, windows. Do not<\/p>\n<p>alter or damage wall-mounted air conditioners.<\/p>\n<p>3.14<\/p>\n<p>Buildings with flat roof and parapet<\/p>\n<p>(a)<\/p>\n<p>Place the satellite dish on the flat roof approximately 15 feet<\/p>\n<p>from the parapet above the manor for which the service is<\/p>\n<p>being provided. At no time can the dish be mounted on the<\/p>\n<p>side of the building or to existing fascias.<\/p>\n<p>(b)<\/p>\n<p>For installation of a satellite dish onto a flat PVC cool roof,<\/p>\n<p>the member must install a 3\u00b0 X 3\u2019 satellite dish pad provided<\/p>\n<p>Standard 5B \u2014 Satellite Dishes: 2 Story Buildings<\/p>\n<p>Page 3 of 5<br \/>\nby the Mutual&#8217;s roofing contractor at the expense of the<\/p>\n<p>Member.<\/p>\n<p>(c)<\/p>\n<p>Mount the satellite dish on a non-penetrating satellite dish<\/p>\n<p>roof-mount weighted down by a minimum of four, 8\u201d x 8\u201d x<\/p>\n<p>16\u201d cinderblocks (see Example 1 below).<\/p>\n<p>(d)<\/p>\n<p>Extend the coaxial cable from the dish across the surface of<\/p>\n<p>the flat roof to the parapet. Continue the coaxial cable up the<\/p>\n<p>wall of the parapet, over the crown, and down until it is<\/p>\n<p>several inches below an existing wire- mold installation. (Do<\/p>\n<p>not attach the coaxial cable to the interior wall of the parapet<\/p>\n<p>with fasteners.) Attach new wire mold immediately below the<\/p>\n<p>existing wire mold installation and continue vertically and<\/p>\n<p>horizontally as required to reach the manor 24&#8243; from the<\/p>\n<p>floor. Encase the coaxial cable in the attached wire mold.<\/p>\n<p>Penetrate the wall to bring coaxial cable into the manor.<\/p>\n<p>(See 3.5)<\/p>\n<p>(e)<\/p>\n<p>Do not use, alter or damage existing wire mold installation.<\/p>\n<p>3.15<\/p>\n<p>Seville<\/p>\n<p>(a)<\/p>\n<p>Place the satellite dish approximately 15 feet from the edge<\/p>\n<p>of the flat roof above the manor for which the service is<\/p>\n<p>being provided. At no time can the dish be mounted on the<\/p>\n<p>side of the building, existing fascia, or on roof beams.<\/p>\n<p>(b)<\/p>\n<p>For installation of a satellite dish onto a flat PVC cool roof,<\/p>\n<p>the member must install a 3\u2019 X 3\u2019 satellite dish pad provided<\/p>\n<p>by the Mutual&#8217;s roofing contractor at the expense of the<\/p>\n<p>Member.<\/p>\n<p>(c)<\/p>\n<p>Mount the satellite dish on a non-penetrating satellite dish<\/p>\n<p>roof-mount weighted down by a minimum of four, 8\u201d x 8\u201d x<\/p>\n<p>16\u201d concrete blocks (see Example 1 below).<\/p>\n<p>(d)<\/p>\n<p>Extend the coaxial cable from the dish across the surface of<\/p>\n<p>the roof to the fascia. Attach the coaxial cable to the inside of<\/p>\n<p>the fascia and continue down to a location that is directly in<\/p>\n<p>line above the room selected for installation of the jack.<\/p>\n<p>Attach the coaxial cable to the overhang and continue to the<\/p>\n<p>wall of the building. Attach wire mold to the wall, vertically, in<\/p>\n<p>a straight line down to provide entry to the manor 24&#8243; from<\/p>\n<p>the floor. Encase the coaxial cable in the attached wire mold.<\/p>\n<p>Penetrate the wall to bring coaxial cable into the manor.<\/p>\n<p>(See 3.5)<\/p>\n<p>(e)<\/p>\n<p>Do not use, alter or damage existing wire mold installation.<\/p>\n<p>Do not alter or damage rain gutters.<\/p>\n<p>Standard 5B \u2014 Satellite Dishes: 2 Story Buildings<\/p>\n<p>Page 4 of 5<br \/>\n3.16<\/p>\n<p>Casa Milano, La Quinta and Villa Lugano series<\/p>\n<p>(a)<\/p>\n<p>Mounting of satellite dishes on buildings is permitted only<\/p>\n<p>upon approval of Permits and Inspections office of a detailed<\/p>\n<p>plan indicating all work to be done, i.e., size, location,<\/p>\n<p>description and specifications.<\/p>\n<p>(b)<\/p>\n<p>Satellite dish installation is permitted on Excusive Use<\/p>\n<p>Common Area, e.g., patios or balconies. Dish must stay<\/p>\n<p>within footprint of patio of perimeter of balcony railing.<\/p>\n<p>AN<\/p>\n<p>\/\/<\/p>\n<p>\/\/<\/p>\n<p>ANY<\/p>\n<p>ys pr<\/p>\n<p>XN\u201d<\/p>\n<p>Example 1: Non-Penetratina Satellite Dish Roof Mount<\/p>\n<p>Standard 5B \u2014 Satellite Dishes: 2 Story Buildings<\/p>\n<p>Page 5 of 5<\/p>","protected":false},"author":2,"featured_media":0,"template":"","document_category":[1075,1740],"document_type":[53],"class_list":["post-18050","document","type-document","status-publish","hentry","document_category-architectural-standards-operating-rules-third","document_category-third-architectural-standards-ma","document_type-other"],"acf":{"document":5458,"resolutions":null,"legacy_id":"","pdf_extracted_text":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.1.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Third Standard 05B - Satellite Dishes on 2 Story Buildings | Laguna Woods Village<\/title>\n<meta name=\"robots\" content=\"noindex, follow\" \/>\n<meta property=\"og:locale\" content=\"zh_HK\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Third Standard 05B - Satellite Dishes on 2 Story Buildings | Laguna Woods Village\" \/>\n<meta property=\"og:description\" content=\"dR UN THIRD LAG U \/ A HILLS STANDARD 5B: SATELLITE DISHES; TWO-STORY BUILDINGS ADOPTED NOVEMBER 2006, RESOLUTION 03-06-58 REVISED APRIL 2007, RESOLUTION 03-07-32 GENERAL REQUIREMENTS REVISED APRIL 2011, RESOLUTION 03-11-49 REVISED NOVEMBER 2013, RESOLUTION 03-13-120 GENERAL REQUIREMENTS REVISED JANUARY 2018, RESOLUTION 03-18-12 REVISED JUNE 2018, RESOLUTION 03-18-87 1.0 GENERAL REQUIREMENTS SEE STANDARD 1: GENERAL [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/lagunawoodsvillage.com\/zh_hk\/document\/third-standard-5b-satellite-dishes-on-2-story-buildings\/\" \/>\n<meta property=\"og:site_name\" content=\"Laguna Woods Village\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/LagunaWoodsVillage\/\" \/>\n<meta property=\"article:modified_time\" content=\"2025-07-09T22:14:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/attachments.lagunawoodsvillage.com\/wp-content\/uploads\/2024\/06\/26175354\/2c5053c2b1c58b7e3c7faae3205bbe3e.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"614\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/lagunawoodsvillage.com\/document\/third-standard-5b-satellite-dishes-on-2-story-buildings\/\",\"url\":\"https:\/\/lagunawoodsvillage.com\/document\/third-standard-5b-satellite-dishes-on-2-story-buildings\/\",\"name\":\"Third Standard 05B - Satellite Dishes on 2 Story Buildings | Laguna Woods Village\",\"isPartOf\":{\"@id\":\"https:\/\/lagunawoodsvillage.com\/#website\"},\"datePublished\":\"2017-07-19T22:42:57+00:00\",\"dateModified\":\"2025-07-09T22:14:24+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/lagunawoodsvillage.com\/document\/third-standard-5b-satellite-dishes-on-2-story-buildings\/#breadcrumb\"},\"inLanguage\":\"zh-HK\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/lagunawoodsvillage.com\/document\/third-standard-5b-satellite-dishes-on-2-story-buildings\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/lagunawoodsvillage.com\/document\/third-standard-5b-satellite-dishes-on-2-story-buildings\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/lagunawoodsvillage.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Third Standard 05B &#8211; Satellite Dishes on 2 Story Buildings\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/lagunawoodsvillage.com\/#website\",\"url\":\"https:\/\/lagunawoodsvillage.com\/\",\"name\":\"Laguna Woods Village\",\"description\":\"Private Retirement Community in Orange County, California\",\"publisher\":{\"@id\":\"https:\/\/lagunawoodsvillage.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/lagunawoodsvillage.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"zh-HK\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/lagunawoodsvillage.com\/#organization\",\"name\":\"Laguna Woods Village\",\"url\":\"https:\/\/lagunawoodsvillage.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-HK\",\"@id\":\"https:\/\/lagunawoodsvillage.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/attachments.lagunawoodsvillage.com\/wp-content\/uploads\/2024\/06\/21232229\/laguna-woods-logo.jpg\",\"contentUrl\":\"https:\/\/attachments.lagunawoodsvillage.com\/wp-content\/uploads\/2024\/06\/21232229\/laguna-woods-logo.jpg\",\"width\":502,\"height\":266,\"caption\":\"Laguna Woods Village\"},\"image\":{\"@id\":\"https:\/\/lagunawoodsvillage.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/LagunaWoodsVillage\/\",\"https:\/\/www.youtube.com\/user\/LagunaWoodsVlg\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Third Standard 05B - Satellite Dishes on 2 Story Buildings | Laguna Woods Village","robots":{"index":"noindex","follow":"follow"},"og_locale":"zh_HK","og_type":"article","og_title":"Third Standard 05B - Satellite Dishes on 2 Story Buildings | Laguna Woods Village","og_description":"dR UN THIRD LAG U \/ A HILLS STANDARD 5B: SATELLITE DISHES; TWO-STORY BUILDINGS ADOPTED NOVEMBER 2006, RESOLUTION 03-06-58 REVISED APRIL 2007, RESOLUTION 03-07-32 GENERAL REQUIREMENTS REVISED APRIL 2011, RESOLUTION 03-11-49 REVISED NOVEMBER 2013, RESOLUTION 03-13-120 GENERAL REQUIREMENTS REVISED JANUARY 2018, RESOLUTION 03-18-12 REVISED JUNE 2018, RESOLUTION 03-18-87 1.0 GENERAL REQUIREMENTS SEE STANDARD 1: GENERAL [&hellip;]","og_url":"https:\/\/lagunawoodsvillage.com\/zh_hk\/document\/third-standard-5b-satellite-dishes-on-2-story-buildings\/","og_site_name":"Laguna Woods Village","article_publisher":"https:\/\/www.facebook.com\/LagunaWoodsVillage\/","article_modified_time":"2025-07-09T22:14:24+00:00","og_image":[{"width":1024,"height":614,"url":"https:\/\/attachments.lagunawoodsvillage.com\/wp-content\/uploads\/2024\/06\/26175354\/2c5053c2b1c58b7e3c7faae3205bbe3e.jpeg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/lagunawoodsvillage.com\/document\/third-standard-5b-satellite-dishes-on-2-story-buildings\/","url":"https:\/\/lagunawoodsvillage.com\/document\/third-standard-5b-satellite-dishes-on-2-story-buildings\/","name":"Third Standard 05B - Satellite Dishes on 2 Story Buildings | Laguna Woods Village","isPartOf":{"@id":"https:\/\/lagunawoodsvillage.com\/#website"},"datePublished":"2017-07-19T22:42:57+00:00","dateModified":"2025-07-09T22:14:24+00:00","breadcrumb":{"@id":"https:\/\/lagunawoodsvillage.com\/document\/third-standard-5b-satellite-dishes-on-2-story-buildings\/#breadcrumb"},"inLanguage":"zh-HK","potentialAction":[{"@type":"ReadAction","target":["https:\/\/lagunawoodsvillage.com\/document\/third-standard-5b-satellite-dishes-on-2-story-buildings\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/lagunawoodsvillage.com\/document\/third-standard-5b-satellite-dishes-on-2-story-buildings\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/lagunawoodsvillage.com\/"},{"@type":"ListItem","position":2,"name":"Third Standard 05B &#8211; Satellite Dishes on 2 Story Buildings"}]},{"@type":"WebSite","@id":"https:\/\/lagunawoodsvillage.com\/#website","url":"https:\/\/lagunawoodsvillage.com\/","name":"\u62c9\u53e4\u7d0d\u4f0d\u8332\u6751","description":"\u52a0\u5dde\u6a58\u90e1\u79c1\u4eba\u9000\u4f11\u793e\u5340","publisher":{"@id":"https:\/\/lagunawoodsvillage.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/lagunawoodsvillage.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"zh-HK"},{"@type":"Organization","@id":"https:\/\/lagunawoodsvillage.com\/#organization","name":"\u62c9\u53e4\u7d0d\u4f0d\u8332\u6751","url":"https:\/\/lagunawoodsvillage.com\/","logo":{"@type":"ImageObject","inLanguage":"zh-HK","@id":"https:\/\/lagunawoodsvillage.com\/#\/schema\/logo\/image\/","url":"https:\/\/attachments.lagunawoodsvillage.com\/wp-content\/uploads\/2024\/06\/21232229\/laguna-woods-logo.jpg","contentUrl":"https:\/\/attachments.lagunawoodsvillage.com\/wp-content\/uploads\/2024\/06\/21232229\/laguna-woods-logo.jpg","width":502,"height":266,"caption":"Laguna Woods Village"},"image":{"@id":"https:\/\/lagunawoodsvillage.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/LagunaWoodsVillage\/","https:\/\/www.youtube.com\/user\/LagunaWoodsVlg"]}]}},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/lagunawoodsvillage.com\/zh_hk\/wp-json\/wp\/v2\/document\/18050","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lagunawoodsvillage.com\/zh_hk\/wp-json\/wp\/v2\/document"}],"about":[{"href":"https:\/\/lagunawoodsvillage.com\/zh_hk\/wp-json\/wp\/v2\/types\/document"}],"author":[{"embeddable":true,"href":"https:\/\/lagunawoodsvillage.com\/zh_hk\/wp-json\/wp\/v2\/users\/2"}],"version-history":[{"count":3,"href":"https:\/\/lagunawoodsvillage.com\/zh_hk\/wp-json\/wp\/v2\/document\/18050\/revisions"}],"predecessor-version":[{"id":73206,"href":"https:\/\/lagunawoodsvillage.com\/zh_hk\/wp-json\/wp\/v2\/document\/18050\/revisions\/73206"}],"wp:attachment":[{"href":"https:\/\/lagunawoodsvillage.com\/zh_hk\/wp-json\/wp\/v2\/media?parent=18050"}],"wp:term":[{"taxonomy":"document_category","embeddable":true,"href":"https:\/\/lagunawoodsvillage.com\/zh_hk\/wp-json\/wp\/v2\/document_category?post=18050"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/lagunawoodsvillage.com\/zh_hk\/wp-json\/wp\/v2\/document_type?post=18050"}],"curies":[{"name":"\u53ef\u6fd5\u6027\u7c89\u5291","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}