Asphalt Work at Town Centre

Concrete repairs in the parking lot of the Community Center (part of Town Centre) are scheduled for Saturday, December 2. Town Centre’s vendor will arrive between 6:30 and 7 a.m. to cone off areas that need to be addressed, leaving the drive aisles available for traffic flow, if needed.

Please click the orange download button below to view the map of scheduled work.

欲了解更多村莊新聞,請點擊下面的標籤「村莊裡發生了什麼事」。

作者

下載PDF