{"id":48729,"date":"2018-01-29T00:00:00","date_gmt":"2018-01-29T08:00:00","guid":{"rendered":"https:\/\/dev-laguna-woods.pantheonsite.io\/document\/grf-maintenance-construction-project-log\/"},"modified":"2026-02-17T13:30:50","modified_gmt":"2026-02-17T21:30:50","slug":"grf-maintenance-construction-project-log","status":"publish","type":"document","link":"https:\/\/lagunawoodsvillage.com\/fr\/document\/grf-maintenance-construction-project-log\/","title":{"rendered":"Journal du projet de maintenance et de construction GRF"},"content":{"rendered":"<p>GRF Project Log November 2025<\/p>\n<p>Estimated<\/p>\n<p>Budget as of<\/p>\n<p>Type<\/p>\n<p>Nom<\/p>\n<p>Description<\/p>\n<p>Statut<\/p>\n<p>Completion<\/p>\n<p>October 2025<\/p>\n<p>A supplemental appropriation for this project<\/p>\n<p>Supplemental<\/p>\n<p>Approved bidder withdrew bid after selection.<\/p>\n<p>was approved to install acoustic panels in<\/p>\n<p>Appropriation: $8,717<\/p>\n<p>Clubhouse 1 Acoustic Panels (Pilot)<\/p>\n<p>A new recommendation will be presented at a<\/p>\n<p>February 2026<\/p>\n<p>Clubhouse 1, Dining Room 2, as a pilot<\/p>\n<p>Exp: SO<\/p>\n<p>project.<\/p>\n<p>future M&amp;C Committee meeting.<\/p>\n<p>Balance: $8,717<\/p>\n<p>Funding for this project is allocated for the<\/p>\n<p>Full amount of $100,000 defunded by Board<\/p>\n<p>Auto Lighting Controls<\/p>\n<p>installation of additional automatic lighting<\/p>\n<p>N\/A<\/p>\n<p>Defunded<\/p>\n<p>on September 2, 2025. Resolution 90-25-57<\/p>\n<p>controls throughout all GRF facilities.<\/p>\n<p>Funding for this project is allocated for the<\/p>\n<p>Approved bidder withdrew bid after selection.<\/p>\n<p>Budget: $100,000<\/p>\n<p>Clubhouse 1 Fitness Center HVAC<\/p>\n<p>replacement of the Fitness Center HVAC<\/p>\n<p>June 2026<\/p>\n<p>system that is 20 years old and has<\/p>\n<p>A new recommendation will be presented at a<\/p>\n<p>Exp: SO<\/p>\n<p>future M&amp;C Committee meeting.<\/p>\n<p>Balance: $100,000<\/p>\n<p>surpassed its useful life of 15 years.<\/p>\n<p>Funding for this project is allocated for<\/p>\n<p>Clubhouse 1 Generator<\/p>\n<p>replacement of the existing generator which<\/p>\n<p>Full amount of $29,500 defunded by Board on<\/p>\n<p>N\/A<\/p>\n<p>Defunded<\/p>\n<p>September 2, 2025. Resolution 90-25-57<\/p>\n<p>is past its useful life of 20 years.<\/p>\n<p>Consultant proposals were recreived and<\/p>\n<p>Funding for this project is allocated for the<\/p>\n<p>under review. The proposals will be evaluated<\/p>\n<p>Budget: $50,000<\/p>\n<p>Clubhouse 2 Annex Building<\/p>\n<p>initial assessment expenses associated for<\/p>\n<p>and a recommendation for a contract award<\/p>\n<p>January 2026<\/p>\n<p>Exp: SO<\/p>\n<p>Assessment\/Renovation<\/p>\n<p>the Annex Building.<\/p>\n<p>will be presented at futrue M&amp;C Committee<\/p>\n<p>Balance: $50,000<\/p>\n<p>meeting.<\/p>\n<p>Funding for this project is allocated for the<\/p>\n<p>Clubhouse 2 Annex Building &amp; Pool<\/p>\n<p>replacement of the 2-piece clay tile roof<\/p>\n<p>Full amount of $182,000 defunded by Board<\/p>\n<p>Defunded<\/p>\n<p>Area Roofs<\/p>\n<p>system that has surpassed its useful life of 60<\/p>\n<p>on September 2, 2025. Resolution 90-25-57<\/p>\n<p>N\/A<\/p>\n<p>years.<\/p>\n<p>A recommendation for a contract award will<\/p>\n<p>Budget: $75,000<\/p>\n<p>Clubhouse 2 Pool Plastering<\/p>\n<p>Funding for this project is allocated for re-<\/p>\n<p>be presented at the December 10 M&amp;C<\/p>\n<p>May 2026<\/p>\n<p>Exp: SO<\/p>\n<p>plastering the Clubhouse 2 pool.<\/p>\n<p>Committee meeting.<\/p>\n<p>Balance: $75,000<\/p>\n<p>Electrical engineering is scheduled to be<\/p>\n<p>Clubhouse 3 PAC Electrical Panel<\/p>\n<p>Funding for this project is allocated for the<\/p>\n<p>completed end of January. Once received, staff<\/p>\n<p>Budget: $50,000<\/p>\n<p>design and replacement of the current<\/p>\n<p>February 2026<\/p>\n<p>Exp: SO<\/p>\n<p>Design\/Upgrade<\/p>\n<p>will advertise an RFP for contractor bid<\/p>\n<p>electrical panel.<\/p>\n<p>Balance: $50,000<\/p>\n<p>proposals.<\/p>\n<p>A recommendation to award a contract will be<\/p>\n<p>Budget: $45,000<\/p>\n<p>Funding for this project is allocated for re-<\/p>\n<p>Clubhouse 6 Pool Plastering<\/p>\n<p>presented at the December 10 GRF M&amp;C<\/p>\n<p>June 2026<\/p>\n<p>Exp: SO<\/p>\n<p>plastering the Clubhouse 6 pool.<\/p>\n<p>Committee meeting.<\/p>\n<p>Balance: $45,000<br \/>\nEstimated<\/p>\n<p>Budget as of<\/p>\n<p>Type<\/p>\n<p>Nom<\/p>\n<p>Description<\/p>\n<p>Statut<\/p>\n<p>Completion<\/p>\n<p>October 2025<\/p>\n<p>A contract has been executed. Installation of<\/p>\n<p>Budget: $175,000<\/p>\n<p>10<\/p>\n<p>Clubhouse 7 HVAC System<\/p>\n<p>Funding for this project is allocated for the<\/p>\n<p>the new unit is scheduled to begin December<\/p>\n<p>February 2026<\/p>\n<p>Exp: $59,954<\/p>\n<p>replacement of the HVAC system.<\/p>\n<p>8<\/p>\n<p>Balance: $115,046<\/p>\n<p>Funding for this project is allocated for the<\/p>\n<p>RFP has been advertised. The results of the bid<\/p>\n<p>Budget: $150,000<\/p>\n<p>11<\/p>\n<p>Clubhouse 7 LED Lighting Upgrade<\/p>\n<p>addition of LED lighting upgrade consisting of<\/p>\n<p>phase as well as recommendations will be<\/p>\n<p>TBD<\/p>\n<p>Exp: SO<\/p>\n<p>Balance: $150,000<\/p>\n<p>light bulbs, fixtures, and ballasts.<\/p>\n<p>presented at future meeting.<\/p>\n<p>Funding is allocated for the review and<\/p>\n<p>RFP has been advertised. The results of the bid<\/p>\n<p>Clubhouses, Community Center, and<\/p>\n<p>implementation of an updated Energy<\/p>\n<p>Budget: $390,000<\/p>\n<p>12<\/p>\n<p>phase as well as recommendations will be<\/p>\n<p>TBD<\/p>\n<p>Exp: SO<\/p>\n<p>Broadband EMS<\/p>\n<p>Management System (EMS) for Clubhouses,<\/p>\n<p>presented at future meeting.<\/p>\n<p>Balance: $390,000<\/p>\n<p>Community Center and Broadband.<\/p>\n<p>Funding for this project is allocated for the<\/p>\n<p>Full amount of $25,000 was defunded by the<\/p>\n<p>13<\/p>\n<p>Garden Center Bathroom Refurbish<\/p>\n<p>renovation of Garden Center 2 restrooms<\/p>\n<p>N\/A<\/p>\n<p>Defunded<\/p>\n<p>Board on September 2, 2025. Resolution 90-25<\/p>\n<p>that show signs of wear and tear.<\/p>\n<p>57<\/p>\n<p>Funding for this project is allocated for the<\/p>\n<p>Full amount of $25,000 defunded by Board on<\/p>\n<p>14<\/p>\n<p>Garden Center Building Exteriors<\/p>\n<p>structural repair and improvement of Garden<\/p>\n<p>N\/A<\/p>\n<p>Defunded<\/p>\n<p>September 2, 2025. Resolution 90-25-57<\/p>\n<p>Center 2 buildings.<\/p>\n<p>Funding for this project is allocated for a<\/p>\n<p>Equestrian Center Arena Lighting<\/p>\n<p>Full amount of $100,000 defunded by Board<\/p>\n<p>15<\/p>\n<p>lighting system to provide lighting for arenas<\/p>\n<p>N\/A<\/p>\n<p>Defunded<\/p>\n<p>System<\/p>\n<p>on September 2, 2025. Resolution 90-25-57<\/p>\n<p>and pathways.<\/p>\n<p>Funding for this project is allocated for<\/p>\n<p>Remaining amount of $85,349 defunded by<\/p>\n<p>Budget: $914,651<\/p>\n<p>PAC Renovation Maintenance<\/p>\n<p>16<\/p>\n<p>maintenance and safety upgrades at the<\/p>\n<p>Board on September 2, 2025. Resolution 90-25<\/p>\n<p>N\/A<\/p>\n<p>Exp: $914,651<\/p>\n<p>Upgrades<\/p>\n<p>Performing Arts Center.<\/p>\n<p>57<\/p>\n<p>Balance: SO<\/p>\n<p>Funding for this project is allocated for the<\/p>\n<p>A recommendation for the award of the<\/p>\n<p>Budget: $100,000<\/p>\n<p>17<\/p>\n<p>Pool Chemical Distribution Upgrades<\/p>\n<p>replacement of aging equipment that is<\/p>\n<p>contract will be presented at the December 10<\/p>\n<p>March 2026<\/p>\n<p>Exp: SO<\/p>\n<p>prone to malfunction.<\/p>\n<p>M&amp;C Committee meeting.<\/p>\n<p>Balance: $100,000<\/p>\n<p>Funding for this project is allocated for the<\/p>\n<p>Budget: $35,000<\/p>\n<p>The Board of Directors postponed work on this<\/p>\n<p>18<\/p>\n<p>Par 3 Shade Cover<\/p>\n<p>replacement of the shade cover at the Par 3<\/p>\n<p>TBD<\/p>\n<p>Exp: SO<\/p>\n<p>project.<\/p>\n<p>Golf Facility.<\/p>\n<p>Balance: $35,000<br \/>\nEstimated<\/p>\n<p>Budget as of<\/p>\n<p>Type<\/p>\n<p>Nom<\/p>\n<p>Description<\/p>\n<p>Statut<\/p>\n<p>Completion<\/p>\n<p>October 2025<\/p>\n<p>COMPLETED<\/p>\n<p>Funding for this project is allocated for the<\/p>\n<p>Budget: $500,000<\/p>\n<p>Clubhouse 3 PAC Sound System<\/p>\n<p>replacement of the auditorium sound<\/p>\n<p>COMPLETED<\/p>\n<p>February 2025<\/p>\n<p>Exp: $449,048<\/p>\n<p>system.<\/p>\n<p>Balance: $50,952<\/p>\n<p>Funding for this project is allocated to<\/p>\n<p>2024 Budget: $25,000<\/p>\n<p>resurface the Clubhouse 2 pool deck. The<\/p>\n<p>2025 Budget: $300,000<\/p>\n<p>Clubhouse 2 Pool Deck Resurfacing<\/p>\n<p>COMPLETED<\/p>\n<p>Mai 2025<\/p>\n<p>concrete deck will be replaced with concrete<\/p>\n<p>Exp: $306,882<\/p>\n<p>pavers.<\/p>\n<p>Balance: $18,118<\/p>\n<p>Funding for this project is allocated for<\/p>\n<p>Budget: $302,000<\/p>\n<p>concrete repairs adjacent to the overlay and<\/p>\n<p>COMPLETED<\/p>\n<p>Parkway Concrete Replacement<\/p>\n<p>seal coat work on selected GRF streets<\/p>\n<p>August 2025<\/p>\n<p>Exp: $302,000<\/p>\n<p>Balance: SO<\/p>\n<p>and\/or parking lot areas.<\/p>\n<p>Funding for this project is allocated for<\/p>\n<p>Budget: $982,000<\/p>\n<p>Asphalt Replacement<\/p>\n<p>asphalt paving overlay on selected GRF<\/p>\n<p>COMPLETED<\/p>\n<p>October 2025<\/p>\n<p>Exp: $982,000<\/p>\n<p>streets and\/or parking lot areas.<\/p>\n<p>Balance: SO<\/p>\n<p>Funding for this project is allocated for<\/p>\n<p>sealcoat GRF pavement areas based on a<\/p>\n<p>Budget: $118,000<\/p>\n<p>Seal Coat<\/p>\n<p>COMPLETED<\/p>\n<p>October 2025<\/p>\n<p>Exp: $118,000<\/p>\n<p>seven year cycle for GRF streets and\/or<\/p>\n<p>Balance: SO<\/p>\n<p>parking lot areas.<\/p>","protected":false},"author":2,"featured_media":0,"template":"","document_category":[1120],"document_type":[53],"class_list":["post-48729","document","type-document","status-publish","hentry","document_category-maintenance-project-logs","document_type-other"],"acf":{"document":81588,"resolutions":null,"legacy_id":"2068","pdf_extracted_text":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.1.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>GRF Maintenance &amp; Construction Project Log | Laguna Woods Village<\/title>\n<meta name=\"robots\" content=\"noindex, follow\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"GRF Maintenance &amp; Construction Project Log | Laguna Woods Village\" \/>\n<meta property=\"og:description\" content=\"GRF Project Log November 2025 Estimated Budget as of Type Name Description Status Completion October 2025 A supplemental appropriation for this project Supplemental Approved bidder withdrew bid after selection. was approved to install acoustic panels in Appropriation: $8,717 Clubhouse 1 Acoustic Panels (Pilot) A new recommendation will be presented at a February 2026 Clubhouse 1, [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/lagunawoodsvillage.com\/fr\/document\/grf-maintenance-construction-project-log\/\" \/>\n<meta property=\"og:site_name\" content=\"Laguna Woods Village\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/LagunaWoodsVillage\/\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-17T21:30:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/attachments.lagunawoodsvillage.com\/wp-content\/uploads\/2024\/06\/26175354\/2c5053c2b1c58b7e3c7faae3205bbe3e.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"614\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/lagunawoodsvillage.com\/document\/grf-maintenance-construction-project-log\/\",\"url\":\"https:\/\/lagunawoodsvillage.com\/document\/grf-maintenance-construction-project-log\/\",\"name\":\"GRF Maintenance & Construction Project Log | Laguna Woods Village\",\"isPartOf\":{\"@id\":\"https:\/\/lagunawoodsvillage.com\/#website\"},\"datePublished\":\"2018-01-29T08:00:00+00:00\",\"dateModified\":\"2026-02-17T21:30:50+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/lagunawoodsvillage.com\/document\/grf-maintenance-construction-project-log\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/lagunawoodsvillage.com\/document\/grf-maintenance-construction-project-log\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/lagunawoodsvillage.com\/document\/grf-maintenance-construction-project-log\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/lagunawoodsvillage.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"GRF Maintenance &#038; Construction Project Log\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/lagunawoodsvillage.com\/#website\",\"url\":\"https:\/\/lagunawoodsvillage.com\/\",\"name\":\"Laguna Woods Village\",\"description\":\"Private Retirement Community in Orange County, California\",\"publisher\":{\"@id\":\"https:\/\/lagunawoodsvillage.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/lagunawoodsvillage.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/lagunawoodsvillage.com\/#organization\",\"name\":\"Laguna Woods Village\",\"url\":\"https:\/\/lagunawoodsvillage.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/lagunawoodsvillage.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/attachments.lagunawoodsvillage.com\/wp-content\/uploads\/2024\/06\/21232229\/laguna-woods-logo.jpg\",\"contentUrl\":\"https:\/\/attachments.lagunawoodsvillage.com\/wp-content\/uploads\/2024\/06\/21232229\/laguna-woods-logo.jpg\",\"width\":502,\"height\":266,\"caption\":\"Laguna Woods Village\"},\"image\":{\"@id\":\"https:\/\/lagunawoodsvillage.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/LagunaWoodsVillage\/\",\"https:\/\/www.youtube.com\/user\/LagunaWoodsVlg\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"GRF Maintenance & Construction Project Log | Laguna Woods Village","robots":{"index":"noindex","follow":"follow"},"og_locale":"fr_FR","og_type":"article","og_title":"GRF Maintenance & Construction Project Log | Laguna Woods Village","og_description":"GRF Project Log November 2025 Estimated Budget as of Type Name Description Status Completion October 2025 A supplemental appropriation for this project Supplemental Approved bidder withdrew bid after selection. was approved to install acoustic panels in Appropriation: $8,717 Clubhouse 1 Acoustic Panels (Pilot) A new recommendation will be presented at a February 2026 Clubhouse 1, [&hellip;]","og_url":"https:\/\/lagunawoodsvillage.com\/fr\/document\/grf-maintenance-construction-project-log\/","og_site_name":"Laguna Woods Village","article_publisher":"https:\/\/www.facebook.com\/LagunaWoodsVillage\/","article_modified_time":"2026-02-17T21:30:50+00:00","og_image":[{"width":1024,"height":614,"url":"https:\/\/attachments.lagunawoodsvillage.com\/wp-content\/uploads\/2024\/06\/26175354\/2c5053c2b1c58b7e3c7faae3205bbe3e.jpeg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/lagunawoodsvillage.com\/document\/grf-maintenance-construction-project-log\/","url":"https:\/\/lagunawoodsvillage.com\/document\/grf-maintenance-construction-project-log\/","name":"GRF Maintenance & Construction Project Log | Laguna Woods Village","isPartOf":{"@id":"https:\/\/lagunawoodsvillage.com\/#website"},"datePublished":"2018-01-29T08:00:00+00:00","dateModified":"2026-02-17T21:30:50+00:00","breadcrumb":{"@id":"https:\/\/lagunawoodsvillage.com\/document\/grf-maintenance-construction-project-log\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/lagunawoodsvillage.com\/document\/grf-maintenance-construction-project-log\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/lagunawoodsvillage.com\/document\/grf-maintenance-construction-project-log\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/lagunawoodsvillage.com\/"},{"@type":"ListItem","position":2,"name":"GRF Maintenance &#038; Construction Project Log"}]},{"@type":"WebSite","@id":"https:\/\/lagunawoodsvillage.com\/#website","url":"https:\/\/lagunawoodsvillage.com\/","name":"Village de Laguna Woods","description":"R\u00e9sidence priv\u00e9e pour retrait\u00e9s dans le comt\u00e9 d&#039;Orange, en Californie","publisher":{"@id":"https:\/\/lagunawoodsvillage.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/lagunawoodsvillage.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/lagunawoodsvillage.com\/#organization","name":"Village de Laguna Woods","url":"https:\/\/lagunawoodsvillage.com\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/lagunawoodsvillage.com\/#\/schema\/logo\/image\/","url":"https:\/\/attachments.lagunawoodsvillage.com\/wp-content\/uploads\/2024\/06\/21232229\/laguna-woods-logo.jpg","contentUrl":"https:\/\/attachments.lagunawoodsvillage.com\/wp-content\/uploads\/2024\/06\/21232229\/laguna-woods-logo.jpg","width":502,"height":266,"caption":"Laguna Woods Village"},"image":{"@id":"https:\/\/lagunawoodsvillage.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/LagunaWoodsVillage\/","https:\/\/www.youtube.com\/user\/LagunaWoodsVlg"]}]}},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/lagunawoodsvillage.com\/fr\/wp-json\/wp\/v2\/document\/48729","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lagunawoodsvillage.com\/fr\/wp-json\/wp\/v2\/document"}],"about":[{"href":"https:\/\/lagunawoodsvillage.com\/fr\/wp-json\/wp\/v2\/types\/document"}],"author":[{"embeddable":true,"href":"https:\/\/lagunawoodsvillage.com\/fr\/wp-json\/wp\/v2\/users\/2"}],"version-history":[{"count":14,"href":"https:\/\/lagunawoodsvillage.com\/fr\/wp-json\/wp\/v2\/document\/48729\/revisions"}],"predecessor-version":[{"id":81589,"href":"https:\/\/lagunawoodsvillage.com\/fr\/wp-json\/wp\/v2\/document\/48729\/revisions\/81589"}],"wp:attachment":[{"href":"https:\/\/lagunawoodsvillage.com\/fr\/wp-json\/wp\/v2\/media?parent=48729"}],"wp:term":[{"taxonomy":"document_category","embeddable":true,"href":"https:\/\/lagunawoodsvillage.com\/fr\/wp-json\/wp\/v2\/document_category?post=48729"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/lagunawoodsvillage.com\/fr\/wp-json\/wp\/v2\/document_type?post=48729"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}