{"id":48728,"date":"2018-01-29T00:00:00","date_gmt":"2018-01-29T08:00:00","guid":{"rendered":"https:\/\/dev-laguna-woods.pantheonsite.io\/document\/third-maintenance-construction-project-log\/"},"modified":"2026-03-06T13:19:32","modified_gmt":"2026-03-06T21:19:32","slug":"third-maintenance-construction-project-log","status":"publish","type":"document","link":"https:\/\/lagunawoodsvillage.com\/es\/document\/third-maintenance-construction-project-log\/","title":{"rendered":"Tercer registro del proyecto de mantenimiento y construcci\u00f3n"},"content":{"rendered":"<p>Third Mutual Project Log &#8211; January 2026<\/p>\n<p>Estimated<\/p>\n<p>Nombre<\/p>\n<p>Description<\/p>\n<p>Status<\/p>\n<p>Completion\/<\/p>\n<p>Budget<\/p>\n<p>(as of October)<\/p>\n<p>On-going Programs<\/p>\n<p>CDS scheduled for 2026: 407 (2 buildings)<\/p>\n<p>Budget: $1,008,972<\/p>\n<p>Prior to Paint<\/p>\n<p>This 15-year full cycle program is funded to repair<\/p>\n<p>CDS in progress: 406 (4 buildings)<\/p>\n<p>Diciembre<\/p>\n<p>Supplemental: $500,000<\/p>\n<p>Program (PTP)<\/p>\n<p>dry rot and decking surfaces prior to painting.<\/p>\n<p>Recorded Exp: $807,032<\/p>\n<p>CDS completed in 2025: 402, 403, 404, 405, 408, 409 (18<\/p>\n<p>Balance: $201,940<\/p>\n<p>buildings)<\/p>\n<p>This 15-year full cycle program is funded to paint<\/p>\n<p>all exterior components of each building including<\/p>\n<p>the body (stucco\/siding); fascia boards; beams;<\/p>\n<p>CDS scheduled for 2026: 406, 407<\/p>\n<p>Exterior Paint<\/p>\n<p>overhangs; doors; closed soffits; structural and<\/p>\n<p>Budget: $1,757,800<\/p>\n<p>ornamental metal surfaces. Decks are top coated<\/p>\n<p>CDS in progress: 404, 405<\/p>\n<p>Diciembre<\/p>\n<p>Recorded Exp: $1,205,535<\/p>\n<p>Program<\/p>\n<p>and damaged building address signs are replaced.<\/p>\n<p>Balance: $552,265<\/p>\n<p>Lead abatement activities are also performed in<\/p>\n<p>CDS completed in 2025: 402, 409, 403, 408<\/p>\n<p>conjunction with this program. This includes<\/p>\n<p>touch-up painting of mutual repairs.<\/p>\n<p>Consultant report was presented to M&amp;C Committee on<\/p>\n<p>Funding is provided for consultant services to<\/p>\n<p>May 5. GV Association recommendations were presented on<\/p>\n<p>Budget: $25,000<\/p>\n<p>3<\/p>\n<p>GV Seepage Study<\/p>\n<p>analyze the seepage into GV garages and report<\/p>\n<p>Diciembre<\/p>\n<p>Recorded Exp: $24,948<\/p>\n<p>September 8. Further discussion planned at January 2026<\/p>\n<p>findings and recommendations.<\/p>\n<p>meeting.<\/p>\n<p>Balance: $52<\/p>\n<p>GV Building<\/p>\n<p>This program is funded to allow for the<\/p>\n<p>26 buildings scheduled in 2025.<\/p>\n<p>Budget: $60,000<\/p>\n<p>installation of metal handrails at entrances to 25<\/p>\n<p>Diciembre<\/p>\n<p>Recorded Exp: $0<\/p>\n<p>Handrails<\/p>\n<p>GV buildings.<\/p>\n<p>10 buildings completed in 2025.<\/p>\n<p>Balance: $60,000<br \/>\nEstimated<\/p>\n<p>Nombre<\/p>\n<p>Status<\/p>\n<p>Budget<\/p>\n<p>Description<\/p>\n<p>Completion\/<\/p>\n<p>On-going Programs<\/p>\n<p>(as of October)<\/p>\n<p>COMPLETED<\/p>\n<p>Roof Replacement<\/p>\n<p>This ongoing program is funded to replace light<\/p>\n<p>Budget: $257,350<\/p>\n<p>Light Weight Tile to<\/p>\n<p>Buildings completed in 2025: 3133, 3220, 3228, 3295, 3431, and<\/p>\n<p>Comp Shingle<\/p>\n<p>eight tile roofs with composition shingle roof<\/p>\n<p>3484.<\/p>\n<p>May &#8211; June<\/p>\n<p>Recorded Exp: $257,346<\/p>\n<p>systems.<\/p>\n<p>Balance: $4<\/p>\n<p>Roofs<\/p>\n<p>GV Rec Room<\/p>\n<p>This program is funded to replace windows in<\/p>\n<p>Budget: $60,000<\/p>\n<p>2025 program cancelled.<\/p>\n<p>Diciembre<\/p>\n<p>Recorded Exp: $0<\/p>\n<p>Windows<\/p>\n<p>Garden Villa Recreation Rooms.<\/p>\n<p>Balance: $60,000<\/p>\n<p>New contract signed in September 2025.<\/p>\n<p>This ongoing program is funded to install<\/p>\n<p>Waste Line<\/p>\n<p>seamless epoxy liners within existing interior and<\/p>\n<p>Buildings completed in 2025: 3181, 3182, 3183, 3184, 3187, 3188,<\/p>\n<p>Budget: $500,000<\/p>\n<p>exterior waste pipes to mitigate future root<\/p>\n<p>Agosto<\/p>\n<p>Recorded Exp: $327,267<\/p>\n<p>Remediation<\/p>\n<p>3189<\/p>\n<p>intrusion as well as to resolve and prevent future<\/p>\n<p>Balance: $172,733<\/p>\n<p>back-up problems related to compromised pipes.<\/p>\n<p>Invoicing is pending.<\/p>\n<p>This ongoing program is funded to extend the life<\/p>\n<p>Seal coat work completed in 2025: CDS 201, 203, 212, 216, 309,<\/p>\n<p>of the asphalt paving by sealing asphalt cracks<\/p>\n<p>310, 314, 327, 344, 346, Via Portora, Vista del Mondo.<\/p>\n<p>Budget: $80,915<\/p>\n<p>Seal Coat Program<\/p>\n<p>and applying a bituminous slurry seal to the<\/p>\n<p>Septiembre<\/p>\n<p>Recorded Exp: $80,915<\/p>\n<p>asphalt surface preventing water intrusion and<\/p>\n<p>Areas previously scheduled for paving moved to seal coat only:<\/p>\n<p>Balance: $0<\/p>\n<p>protecting the asphalt from deterioration.<\/p>\n<p>CDS 339, 349, 368, 377, 3328, 5345, 5508.<\/p>\n<p>Budget: $205,800<\/p>\n<p>Elevator<\/p>\n<p>This ongoing program is funded to replace<\/p>\n<p>Noviembre<\/p>\n<p>Supplemental: $21,600<\/p>\n<p>Replacement<\/p>\n<p>mechanical equipment and interior renovations<\/p>\n<p>Buildings completed in 2025: 4007, 4008 and 4009<\/p>\n<p>Recorded Exp: $227,400<\/p>\n<p>Program<\/p>\n<p>as needed.<\/p>\n<p>Balance: $0<\/p>\n<p>7,731 LF out of 33,761 LF of Shepherd&#8217;s Crook has been installed<\/p>\n<p>as of December 2025.<\/p>\n<p>Budget: $38,000<\/p>\n<p>This program is funded to remove and replace<\/p>\n<p>Recorded Exp: $37,965<\/p>\n<p>Shepherd&#8217;s Crook<\/p>\n<p>Noviembre<\/p>\n<p>barbed wire with Shepherd&#8217;s Crook.<\/p>\n<p>404 LF was installed in 2025 near Gate 11.<\/p>\n<p>Balance: $35<br \/>\nEstimated<\/p>\n<p>Nombre<\/p>\n<p>Status<\/p>\n<p>Budget<\/p>\n<p>Description<\/p>\n<p>Completion\/<\/p>\n<p>On-going Programs<\/p>\n<p>(as of October)<\/p>\n<p>470 total buildings in Gates 7, 9, and 10 scheduled for inspection<\/p>\n<p>in 2025<\/p>\n<p>Budget: $50,000<\/p>\n<p>Annual Termite<\/p>\n<p>This annual program is funded to provide pest<\/p>\n<p>Diciembre<\/p>\n<p>Inspections<\/p>\n<p>control inspection services.<\/p>\n<p>Completed: 470 buildings completed January &#8211; December<\/p>\n<p>Recorded Exp: $0<\/p>\n<p>Balance: $50,000<\/p>\n<p>Invoicing is pending.<\/p>\n<p>55 buildings completed in 2025: 5269, 3438, 5052, 3340, 5140,<\/p>\n<p>5003, 5229, 3184, 3201, 5530, 5550, 5542, 3207, 3394, 3119, 5460,<\/p>\n<p>This annual program is funded to eradicate dry<\/p>\n<p>5446, 3495, 3185, 2278, 961, 2351, 2359, 2127, 2194, 2233, 5259,<\/p>\n<p>wood termites from inaccessible areas by tenting<\/p>\n<p>3117, 3237, 5204, 3202, 3222, 5584, 5181, 5312, 3242, 5264, 5452,<\/p>\n<p>Pest Control for<\/p>\n<p>buildings for fumigation and includes hotel<\/p>\n<p>5155, 3377, 5278, 5510, 2391, 2383, 2401, 2200, 5575, 3322, 3321,<\/p>\n<p>Budget: $605,000<\/p>\n<p>accommodations during whole structure<\/p>\n<p>3486, 5064, 5023, 3171, 2360, 4010<\/p>\n<p>May to November<\/p>\n<p>Recorded Exp: $442,230<\/p>\n<p>Termites<\/p>\n<p>fumigation. The program also includes funding<\/p>\n<p>Balance: $162,770<\/p>\n<p>for local termite treatments and the removal of<\/p>\n<p>Postponed until 2026: 2400, 2352, 5074, 5053, 2386, 5201, 3255,<\/p>\n<p>bees\/wasps as needed.<\/p>\n<p>5397, 3012, 3132, 2309, 2133, 2369<\/p>\n<p>Invoicing is pending.<\/p>\n<p>Gutters &#8211;<\/p>\n<p>Gutter replacement and repairs are performed on<\/p>\n<p>Buildings completed in 2025: 4016, 4017, 4018, 4019, 4020, 4022,<\/p>\n<p>Budget: $60,000<\/p>\n<p>original construction building rain gutters and<\/p>\n<p>4023<\/p>\n<p>Replacement and<\/p>\n<p>Noviembre<\/p>\n<p>Recorded Exp: $17,031<\/p>\n<p>downspout systems that are exhibiting<\/p>\n<p>Repair<\/p>\n<p>deterioration.<\/p>\n<p>Invoicing is pending.<\/p>\n<p>Balance: $42,969<\/p>\n<p>Buildings completed in 2025: 963, 2109, 2176, 2204, 2230, 2254,<\/p>\n<p>This ongoing program is funded to replace roofs<\/p>\n<p>Roof Replacement<\/p>\n<p>at the end of their serviceable life with a PVC Cool<\/p>\n<p>2276, 2281, 2289, 2313, 2351, 2355, 2386, 2398, 3116, 3192, 3366,<\/p>\n<p>Budget: $1,388,375<\/p>\n<p>BUR to PVC Cool<\/p>\n<p>517<\/p>\n<p>June &#8211; November<\/p>\n<p>Recorded Exp: $1,237,694<\/p>\n<p>Roof system. Built-up roofs are inspected 15<\/p>\n<p>Roofing<\/p>\n<p>Balance: $150,681<\/p>\n<p>years after installation.<\/p>\n<p>Invoicing is pending.<\/p>\n<p>This program is funded to implement a systematic;<\/p>\n<p>SB326 Repairs:<\/p>\n<p>Budget: $210,000<\/p>\n<p>Building Structures<\/p>\n<p>B3015: Work is complete.<\/p>\n<p>approach to eradicating wood rot throughout<\/p>\n<p>Diciembre<\/p>\n<p>Recorded Exp: $137,223<\/p>\n<p>Dry Rot Program<\/p>\n<p>Third Mutual.<\/p>\n<p>B2294: Work is complete.<\/p>\n<p>B3415: Work is complete.<\/p>\n<p>Balance: $72,777<\/p>\n<p>This ongoing program is funded to replace<\/p>\n<p>foundations showing signs of distress or<\/p>\n<p>impending failure. These repairs or replacements<\/p>\n<p>Foundation Repairs:<\/p>\n<p>Building Structures<\/p>\n<p>are performed on an as-needed basis. Staff<\/p>\n<p>B3123: Foundation repair. Work is complete.<\/p>\n<p>Budget: $25,000<\/p>\n<p>Diciembre<\/p>\n<p>Recorded Exp: $21,239<\/p>\n<p>Foundations<\/p>\n<p>performs field observations when a foundation<\/p>\n<p>Balance: $3,761<\/p>\n<p>Program<\/p>\n<p>inspection request is received. If needed, a<\/p>\n<p>B2387, B2388, 2239, 5486-A, 5115: Work is complete.<\/p>\n<p>structural engineer is then scheduled to inspect<\/p>\n<p>the foundation and provide a recommendation.<br \/>\nEstimated<\/p>\n<p>Nombre<\/p>\n<p>Status<\/p>\n<p>Budget<\/p>\n<p>Description<\/p>\n<p>Completion\/<\/p>\n<p>On-going Programs<\/p>\n<p>(as of October)<\/p>\n<p>This ongoing program is funded to repair or<\/p>\n<p>replace building structural components that are<\/p>\n<p>Structural Repair\/Replacement Completed:<\/p>\n<p>not performing as designed. As building<\/p>\n<p>Gate 9 Block Wall Repair<\/p>\n<p>structural issues are reported and inspection<\/p>\n<p>Budget: $318,000<\/p>\n<p>equests are received, staff schedules an engineer<\/p>\n<p>B2175 Foundation Repair<\/p>\n<p>Supplemental: $58,260<\/p>\n<p>Building Structures<\/p>\n<p>Parapet Wall Removals:<\/p>\n<p>to field inspect and, if required, provide a<\/p>\n<p>Diciembre<\/p>\n<p>Recorded Exp: $289,853<\/p>\n<p>Replacement<\/p>\n<p>B5107 is complete.<\/p>\n<p>recommendation for repairs. In addition, roofing<\/p>\n<p>B5045 is complete.<\/p>\n<p>Balance: $28,147<\/p>\n<p>repairs are performed after Prior to Paint crews<\/p>\n<p>B5081 is complete.<\/p>\n<p>replace fascia due to dry rot. As part of this<\/p>\n<p>budget, staff will proactively inspect buildings for<\/p>\n<p>drainage issues and provide repairs as needed.<\/p>\n<p>Buildings completed in 2025: 3181, 3182, 3183, 3184, 3187, 3188,<\/p>\n<p>This ongoing program is funded to treat copper<\/p>\n<p>3189<\/p>\n<p>Water Lines &#8211;<\/p>\n<p>Budget: $500,000<\/p>\n<p>Copper Pipe<\/p>\n<p>water lines with an epoxy liquid in all buildings<\/p>\n<p>Diciembre<\/p>\n<p>Recorded Exp: $0<\/p>\n<p>which experience a high frequency of copper pipe<\/p>\n<p>Postponed until 2026: 969, 3242, 5550<\/p>\n<p>Remediation<\/p>\n<p>Balance: $500,000<\/p>\n<p>leaks.<\/p>\n<p>Invoicing pending.<\/p>\n<p>Roofs completed in January 2025:<\/p>\n<p>5 Year Maintenance &#8211; 20 buildings completed.<\/p>\n<p>PVC Roof Repair &amp;<\/p>\n<p>This ongoing program is funded to preserve and<\/p>\n<p>Roofs completed January 2025:<\/p>\n<p>Budget: $92,448<\/p>\n<p>Preventive<\/p>\n<p>prolong the serviceable life of PVC roofs by<\/p>\n<p>10 Year Maintenance &#8211; 42 buildings completed.<\/p>\n<p>Diciembre<\/p>\n<p>Mantenimiento<\/p>\n<p>performing emergent repairs as needed. This<\/p>\n<p>Recorded Exp: $34,469<\/p>\n<p>Balance: $57,979<\/p>\n<p>Programs<\/p>\n<p>also includes flat roof debris clean-up.<\/p>\n<p>310 buildings on the flat roof debris removal program completed<\/p>\n<p>in December 2025.<\/p>\n<p>Invoicing pending.<\/p>","protected":false},"author":2,"featured_media":0,"template":"","document_category":[1120],"document_type":[53],"class_list":["post-48728","document","type-document","status-publish","hentry","document_category-maintenance-project-logs","document_type-other"],"acf":{"document":82043,"resolutions":null,"legacy_id":"2067","pdf_extracted_text":""},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.1.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Third Maintenance &amp; Construction Project Log | Laguna Woods Village<\/title>\n<meta name=\"robots\" content=\"noindex, follow\" \/>\n<meta property=\"og:locale\" content=\"es_MX\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Third Maintenance &amp; Construction Project Log | Laguna Woods Village\" \/>\n<meta property=\"og:description\" content=\"Third Mutual Project Log &#8211; January 2026 Estimated Name Description Status Completion\/ Budget (as of October) On-going Programs CDS scheduled for 2026: 407 (2 buildings) Budget: $1,008,972 Prior to Paint This 15-year full cycle program is funded to repair CDS in progress: 406 (4 buildings) December Supplemental: $500,000 Program (PTP) dry rot and decking surfaces [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/lagunawoodsvillage.com\/es\/document\/third-maintenance-construction-project-log\/\" \/>\n<meta property=\"og:site_name\" content=\"Laguna Woods Village\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/LagunaWoodsVillage\/\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-06T21:19:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/attachments.lagunawoodsvillage.com\/wp-content\/uploads\/2024\/06\/26175354\/2c5053c2b1c58b7e3c7faae3205bbe3e.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"614\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/lagunawoodsvillage.com\/document\/third-maintenance-construction-project-log\/\",\"url\":\"https:\/\/lagunawoodsvillage.com\/document\/third-maintenance-construction-project-log\/\",\"name\":\"Third Maintenance & Construction Project Log | Laguna Woods Village\",\"isPartOf\":{\"@id\":\"https:\/\/lagunawoodsvillage.com\/#website\"},\"datePublished\":\"2018-01-29T08:00:00+00:00\",\"dateModified\":\"2026-03-06T21:19:32+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/lagunawoodsvillage.com\/document\/third-maintenance-construction-project-log\/#breadcrumb\"},\"inLanguage\":\"es-MX\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/lagunawoodsvillage.com\/document\/third-maintenance-construction-project-log\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/lagunawoodsvillage.com\/document\/third-maintenance-construction-project-log\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/lagunawoodsvillage.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Third Maintenance &#038; Construction Project Log\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/lagunawoodsvillage.com\/#website\",\"url\":\"https:\/\/lagunawoodsvillage.com\/\",\"name\":\"Laguna Woods Village\",\"description\":\"Private Retirement Community in Orange County, California\",\"publisher\":{\"@id\":\"https:\/\/lagunawoodsvillage.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/lagunawoodsvillage.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es-MX\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/lagunawoodsvillage.com\/#organization\",\"name\":\"Laguna Woods Village\",\"url\":\"https:\/\/lagunawoodsvillage.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es-MX\",\"@id\":\"https:\/\/lagunawoodsvillage.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/attachments.lagunawoodsvillage.com\/wp-content\/uploads\/2024\/06\/21232229\/laguna-woods-logo.jpg\",\"contentUrl\":\"https:\/\/attachments.lagunawoodsvillage.com\/wp-content\/uploads\/2024\/06\/21232229\/laguna-woods-logo.jpg\",\"width\":502,\"height\":266,\"caption\":\"Laguna Woods Village\"},\"image\":{\"@id\":\"https:\/\/lagunawoodsvillage.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/LagunaWoodsVillage\/\",\"https:\/\/www.youtube.com\/user\/LagunaWoodsVlg\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Third Maintenance & Construction Project Log | Laguna Woods Village","robots":{"index":"noindex","follow":"follow"},"og_locale":"es_MX","og_type":"article","og_title":"Third Maintenance & Construction Project Log | Laguna Woods Village","og_description":"Third Mutual Project Log &#8211; January 2026 Estimated Name Description Status Completion\/ Budget (as of October) On-going Programs CDS scheduled for 2026: 407 (2 buildings) Budget: $1,008,972 Prior to Paint This 15-year full cycle program is funded to repair CDS in progress: 406 (4 buildings) December Supplemental: $500,000 Program (PTP) dry rot and decking surfaces [&hellip;]","og_url":"https:\/\/lagunawoodsvillage.com\/es\/document\/third-maintenance-construction-project-log\/","og_site_name":"Laguna Woods Village","article_publisher":"https:\/\/www.facebook.com\/LagunaWoodsVillage\/","article_modified_time":"2026-03-06T21:19:32+00:00","og_image":[{"width":1024,"height":614,"url":"https:\/\/attachments.lagunawoodsvillage.com\/wp-content\/uploads\/2024\/06\/26175354\/2c5053c2b1c58b7e3c7faae3205bbe3e.jpeg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/lagunawoodsvillage.com\/document\/third-maintenance-construction-project-log\/","url":"https:\/\/lagunawoodsvillage.com\/document\/third-maintenance-construction-project-log\/","name":"Third Maintenance & Construction Project Log | Laguna Woods Village","isPartOf":{"@id":"https:\/\/lagunawoodsvillage.com\/#website"},"datePublished":"2018-01-29T08:00:00+00:00","dateModified":"2026-03-06T21:19:32+00:00","breadcrumb":{"@id":"https:\/\/lagunawoodsvillage.com\/document\/third-maintenance-construction-project-log\/#breadcrumb"},"inLanguage":"es-MX","potentialAction":[{"@type":"ReadAction","target":["https:\/\/lagunawoodsvillage.com\/document\/third-maintenance-construction-project-log\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/lagunawoodsvillage.com\/document\/third-maintenance-construction-project-log\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/lagunawoodsvillage.com\/"},{"@type":"ListItem","position":2,"name":"Third Maintenance &#038; Construction Project Log"}]},{"@type":"WebSite","@id":"https:\/\/lagunawoodsvillage.com\/#website","url":"https:\/\/lagunawoodsvillage.com\/","name":"Pueblo de Laguna Woods","description":"Comunidad de retiro privada en el condado de Orange, California","publisher":{"@id":"https:\/\/lagunawoodsvillage.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/lagunawoodsvillage.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es-MX"},{"@type":"Organization","@id":"https:\/\/lagunawoodsvillage.com\/#organization","name":"Pueblo de Laguna Woods","url":"https:\/\/lagunawoodsvillage.com\/","logo":{"@type":"ImageObject","inLanguage":"es-MX","@id":"https:\/\/lagunawoodsvillage.com\/#\/schema\/logo\/image\/","url":"https:\/\/attachments.lagunawoodsvillage.com\/wp-content\/uploads\/2024\/06\/21232229\/laguna-woods-logo.jpg","contentUrl":"https:\/\/attachments.lagunawoodsvillage.com\/wp-content\/uploads\/2024\/06\/21232229\/laguna-woods-logo.jpg","width":502,"height":266,"caption":"Laguna Woods Village"},"image":{"@id":"https:\/\/lagunawoodsvillage.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/LagunaWoodsVillage\/","https:\/\/www.youtube.com\/user\/LagunaWoodsVlg"]}]}},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/lagunawoodsvillage.com\/es\/wp-json\/wp\/v2\/document\/48728","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lagunawoodsvillage.com\/es\/wp-json\/wp\/v2\/document"}],"about":[{"href":"https:\/\/lagunawoodsvillage.com\/es\/wp-json\/wp\/v2\/types\/document"}],"author":[{"embeddable":true,"href":"https:\/\/lagunawoodsvillage.com\/es\/wp-json\/wp\/v2\/users\/2"}],"version-history":[{"count":19,"href":"https:\/\/lagunawoodsvillage.com\/es\/wp-json\/wp\/v2\/document\/48728\/revisions"}],"predecessor-version":[{"id":82044,"href":"https:\/\/lagunawoodsvillage.com\/es\/wp-json\/wp\/v2\/document\/48728\/revisions\/82044"}],"wp:attachment":[{"href":"https:\/\/lagunawoodsvillage.com\/es\/wp-json\/wp\/v2\/media?parent=48728"}],"wp:term":[{"taxonomy":"document_category","embeddable":true,"href":"https:\/\/lagunawoodsvillage.com\/es\/wp-json\/wp\/v2\/document_category?post=48728"},{"taxonomy":"document_type","embeddable":true,"href":"https:\/\/lagunawoodsvillage.com\/es\/wp-json\/wp\/v2\/document_type?post=48728"}],"curies":[{"name":"gracias","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}